Tower 1 foundations
Foundations of tower 1 of the 2nd section are completed. In these days metal structures will be mounted.
Helbronner Peak – Station saddles
Rope suspension saddles in top station was mounted. The support structure is made completely of metal carpentry and integrated into the particular forms of the station. At the center of the line it was also installed “the tree of the signals” on which will be placed the antennas of the main emergency services.
A new crane
The crane to mount the 2nd tower was installed.
Tower 1 foundations
Works continue with the excavation and construction of the foundations of the tower 1. A soon the crane will be mounted to mount the steel structure.